Legislation Details

File #: PB 26-045    Version: 2 Name:
Type: Planning Board Document Status: Agenda Ready
File created: 7/16/2026 In control: Planning Board
On agenda: 7/27/2026 Final action:
Title: #26-04 Riding to the Top - Major Site Plan - Final Plan Review - 14 Lilac Drive - Riding to the Top Therapeutic Riding Center The application is for expansion of the facility to include a new barn, an outdoor riding area, and a tractor shed, and improvements to the existing indoor arena/office building, a new residence, reconfigured paddocks and parking areas and updated utilities and stormwater facilities. Subject properties are identified as Tax Map: 7; Lot: 27B; Zone: Farm (F) in the Upper Presumpscot River and Inkhorn Brook watersheds.
Attachments: 1. 26-04_PB_MEMO_MJR_SP_FNL_RTT_072026, 2. 26-04_AC&SR_MJR_FP_RTT_070826, 3. 26-04_MJR_SP_FP_RTC_RidingToTheTop_07-10-2026, 4. 26-04_MJR_SP_FP_APPL_RidingToTheTop_07-10-2026, 5. 26-04_MJR_SP_FP_PLANS_RidingToTheTop_07-10-2026, 6. 26-04_MJR_SP_RTT_StormwaterReport_4-2-2026, 7. 26-04_MJR_SWDelegatedReviewComments_RidingToTheTop_063026
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

 

#26-04 Riding to the Top - Major Site Plan - Final Plan Review - 14 Lilac Drive - Riding to the Top Therapeutic Riding Center

The application is for expansion of the facility to include a new barn, an outdoor riding area, and a tractor shed, and improvements to the existing indoor arena/office building, a new residence, reconfigured paddocks and parking areas and updated utilities and stormwater facilities.  Subject properties are identified as Tax Map: 7; Lot: 27B; Zone: Farm (F) in the Upper Presumpscot River and Inkhorn Brook watersheds.