PB 25-032
| 1 | 3. | | Planning Board Document | Approval of Minutes - The meeting of June 9, 2025 | | |
Not available
|
Not available
|
PB 25-033
| 1 | 4. | | Planning Board Document | 25-13 Franklin Drive Multifamily & Solar Development - Major Subdivision & Site Plan - Preliminary Plan Review - Franklin Drive - New Gen Estates, LLC
The application is for 306 apartments in two buildings on a 7.88 acre property and a 425kW large-scale ground-mounted solar energy system comprised of 640 modules on a 23.94 acre property to power the residential development. This project also includes associated parking areas, internal vehicular drive aisles, and the construction of a public access trail to the adjacent Donnabeth Lippman Park. The development will be served by public water and sewer. The subject property is identified as Tax Map: 18; Lots: 26-2-A02 and 26-2-A03; Zone: Commercial 1 (C-1) in the Chaffin Pond/Little Sebago Lake watershed. | | |
Not available
|
Not available
|
PB 25-034
| 1 | 5. | | Planning Board Document | #25-06 Shepherd Lane Subdivision - Major Subdivision & Site Plan - Preliminary & Final Plan Review - 421 Falmouth Road - Robie Holdings, LLC
The application is for a 13-unit single-family residential condominium development of a 22.75 acre property. The development will have a 480 foot access driveway and be served by public water, shared private wastewater disposal systems, and underground utilities. Subject property is identified as Tax Map: 19; Lots: 104 & 90G; Zone: Village Residential (VR) and Farm (F) in the Pleasant River watershed. | | |
Not available
|
Not available
|
PB 25-035
| 1 | 6. | | Planning Board Document | #25-16 - Meredith Woods Subdivision - Major Subdivision - Sketch Plan Review - Meredith Drive -Meredith Way, LLC
The application is to develop a 5-lot conservation subdivision with a paved minor private road 810 feet in length. Lots will range in size from 30,047 SF to 32,227 SF, with the remaining 16.86 acres as open space. Lots will be served by private subsurface wastewater disposal systems, public water and underground utilities. Subject property is identified as Tax Map: 6; Lot: 38-E02; Zone: Farm (F) and Stream Protection (SP) in the Black Brook watershed. | | |
Not available
|
Not available
|
PB 25-036
| 1 | 7. | | Planning Board Document | #25-17 209-211 Tandberg Trail Multifamily - Major Subdivision & Site Plan - Sketch Plan Review - 209 & 211 Tandberg Trail - Moon Apartments, LLC
The application is for the development of 10 apartments by the conversion of an existing mixed-use building that has 2 existing dwellings and a former daycare at 211 Tandberg Trail to add 2 apartments to create a 4-unit building; and constructing a new 8-unit multifamily building. An existing 2 unit building at 209 Tanberg Trail will remain in place. Subject property is identified on Tax Map: 19C; Lots: 50-C and 50-D; Zone: Commercial IV (C-4) in the Pleasant River watershed. | | |
Not available
|
Not available
|
PB 25-037
| 1 | 8. | | Planning Board Document | #25-18 250 Windham Center Road Condos - Major Subdivision & Site Plan - Sketch Plan Review - 250 Windham Center Road - Casco Bay Holdings, LLC
The application is for a 6-unit residential condominium development in 3 duplex buildings on a 3.26 acre property. The development will have a 400-foot private access driveway and be served by public water, private wastewater disposal systems, and underground utilities. Subject property is identified as Tax Map: 12; Lot: 52-A; Zone: Windam Center (WC) in the Black Brook watershed. | | |
Not available
|
Not available
|
PB 25-038
| 1 | 9. | | Planning Board Document | #25-14 Land Use Ordinance Amendments to Article 9 Subdivision Review - Occupancy of Dwellings
The Town is proposing an amendment to Chapter 120, Land Use Ordinance (LUO), Article 9 Subdivision ยง120-915C, to limit occupancy of dwellings accessed on streets designed with a paved surface until the street upon which the unit is accessed is completed at least with the base course of pavement and dwellings accessed on streets designed with a gravel surface until the street upon which the unit is accessed is completed at least with the base course of crushed aggregate. | | |
Not available
|
Not available
|